SigmaForge

Solutions

Lean

There is waste everywhere and no system for removing it.

Lean goes wrong when the waste walk is an event rather than a habit. The eight wastes get logged against the process step they belong to, 5S gets scored rather than eyeballed, and each improvement is tracked with a before and after. Then standard work is written down, because an improvement nobody documented is one that leaves with the person who made it.

What is in the box

  • TIMWOODS waste walk
  • 5S audit
  • Kaizen tracker
  • Poka-Yoke mistake-proofing
  • Standard work and SOP templates

Lives at /lean-tools once you are signed in

What you leave with

  • Waste logged against the step it happens at
  • A scored 5S baseline
  • Kaizens with a measured before and after
  • Standard work somebody can follow

The agents that do this work

How the work is done

  • Lean

    Take the waste out of the flow, then hold the new standard.

    • Waste walk
    • 5S audit
    • Kaizen tracker
    • Mistake-proofing
    • Standard work template
  • Kaizen

    Small improvements, run quickly, with the before and after measured.

    • Kaizen tracker
    • Idea hopper
    • Control chart
    • Pilot plan

All six methodologies

See it on your own data

Thirty minutes. Bring a spreadsheet.