SigmaForge
Thirteen specialists, one loop

Thirteen agents.Each does one job well.

Every one has a screen you open: the analysis, the documents, the coaching, the business case, the learning, the course search and the retrospective.

32
analyses
28 deterministic
14
templates
8 draw a diagram
56
tools
across the loop
5
tollgates
one per phase
1LEARN4 agents2PRACTICE2 agents3APPLY3 agents4TRACK2 agents5OPTIMIZE1 agent6SCALE1 agent

The short video · 0:36

Thirteen agents in thirty-six seconds

DataForge finds where a process is losing yield and says what it means. DocuForge writes the control plan from the project. ProjectSensei names what is blocking the tollgate.

Ten more teach, test, explain and report. All in one place.

See all thirteen

Watch next · 1:32

Your AI study team

Seven agents that teach, each with one job, built into the course.

13 AI agents. One job each.0:36 · Captions

The screens

Thirteen screens, every one of them the product

Captured from the running product on a demo company. Hover to stop the row; on a phone, swipe it.

Every screen is the product, on demo data (Product screen, demo data)

All thirteen

Thirteen agents with a screen of their own

Each takes something small from you and hands back a result you can save into the project. The moving panel on every card is the shape of what it returns.

The journey

Where each one sits on the loop

Some stages carry several agents and one carries a single agent. That is the honest shape of the product rather than a tidy diagram.
  1. 01

    Learn

    Build the foundation

  2. 02

    Practice

    Build skill safely

  3. 03

    Apply

    Run real projects

  4. 04

    Track

    Quantify the impact

  5. 05

    Optimize

    Close the loop

  6. 06

    Scale

    Spread across the organization

Book a demo

See all thirteen on your own project

Thirty minutes, one of your processes, and whichever agents the work calls for. You leave with the analysis and the documents it produced.