Lean thinking divides work into two kinds: activity a customer would pay for, and everything else. The everything else is waste. Lean practitioners group waste into eight types, often remembered with the acronym TIMWOODS. Learning to name them is useful because a named problem is easier to see, measure and remove.

For each waste below there is a manufacturing example, an office or service example, and a question to ask when you walk a process.

T: Transportation

Moving materials, products or information when the move itself adds nothing. Every move costs time and creates a chance for damage or loss.

  • Factory: parts travel from a press to a warehouse and back to an assembly cell next to the press.
  • Office: a purchase request is emailed to four people in sequence, each of whom forwards it without changing it.
  • Ask: why does this item travel this far, and who decided the layout?

I: Inventory

More material, work in progress or finished goods than the next step needs right now. Inventory ties up cash and space, and it hides problems: when there is a large buffer, a broken machine or a late supplier goes unnoticed.

  • Factory: racks of half-finished assemblies waiting for one component.
  • Office: a queue of 200 unprocessed applications, or an inbox used as a to-do list.
  • Ask: how long does an item sit here, and what would happen if the pile were half the size?

M: Motion

Movement of people that does not add value: reaching, bending, walking, searching. Transportation is about the product moving. Motion is about the person moving.

  • Factory: an operator walks to a shared cabinet several times an hour for the same tool.
  • Office: clicking through five screens to find one customer field, or searching shared drives for the latest version of a file.
  • Ask: what does this person reach for most often, and why is it not within reach?

W: Waiting

Idle time when people, machines or information are not ready. Waiting is often the largest share of total lead time, even though nobody is technically doing anything wrong.

  • Factory: a line stops while a first-article inspection is approved.
  • Office: a contract waits several days for a signature from someone who is traveling.
  • Ask: of the total elapsed time, how much is actual work and how much is waiting?

O: Overproduction

Making more, or making it sooner, than the customer needs. Lean practitioners often call this the worst waste because it creates several others: extra inventory, extra transport, extra handling.

  • Factory: running a large batch to avoid a changeover, then storing the surplus for months.
  • Office: producing a weekly report nobody reads, or printing packets for a meeting that most attendees view on a laptop.
  • Ask: who asked for this, and when do they actually need it?

O: Overprocessing

Doing more work than the customer requires: extra steps, tighter tolerances than needed, duplicate approvals, polishing a surface nobody sees.

  • Factory: machining a surface to a finish the drawing does not call for.
  • Office: re-keying the same data into two systems, or three levels of sign-off on a low-value expense.
  • Ask: if this step disappeared, would the customer notice?

D: Defects

Work that is wrong and must be scrapped, reworked, corrected or apologized for. Defects cost the original effort plus the effort to find and fix them, and sometimes the customer relationship.

  • Factory: parts rejected at final inspection for a dimension that drifted during the shift.
  • Office: invoices sent with the wrong price, followed by credit notes and calls.
  • Ask: where is this error first created, and where is it first caught?

S: Skills (unused talent)

Not using the knowledge, ideas and abilities of the people doing the work. It is the waste added most recently to the list, and it is often the most expensive, because the people closest to a process usually know where the other seven wastes are.

  • Factory: operators who have suggested a fixture improvement for years with no response.
  • Office: experienced staff spending most of their day on data entry while improvement ideas sit in an inbox.
  • Ask: when did someone doing this job last get to change how it is done?

How to start finding waste

  1. 01Walk the process where the work happens, and follow one item from start to finish.
  2. 02Record each step and label it value-adding, necessary but non-value-adding, or waste.
  3. 03Measure elapsed time against working time. The gap is usually waiting and inventory.
  4. 04Pick one waste with a clear cause and a willing owner, remove it, and measure again.