SigmaForge
Article · Statistics

Cp vs Cpk, with a worked example

How Cp and Cpk differ, why an off-center process can have a good Cp and a poor Cpk, and the full arithmetic for a worked example.

All articles

By SigmaForge · · 3 min read

Process capability indices answer one question: can this process meet its specification? Cp and Cpk are the two most common. They use the same ingredients but measure different things, and confusing them leads to wrong conclusions about a process.

The ingredients

  • USL and LSL: the upper and lower specification limits, set by the customer or the design.
  • Mean (x̄): the average of the process output.
  • Sigma (σ): the standard deviation of the process. For Cp and Cpk this is the short-term, within-subgroup estimate, often taken from a control chart as R̄ / d₂ or from the pooled standard deviation.

Cp: could the process fit, if it were centered?

Cp compares the width of the specification to the width of the process spread. The process spread is taken as six standard deviations, three on each side of the mean.

Cp = (USL − LSL) / (6σ)

Cp ignores where the process is centered. It tells you the potential of the process: how capable it would be if the mean sat exactly in the middle of the specification.

Cpk: does the process fit, where it actually sits?

Cpk measures the distance from the mean to the nearer specification limit, in units of three standard deviations. It is computed for each side and the smaller value is reported.

Cpu = (USL − x̄) / (3σ)

Cpl = (x̄ − LSL) / (3σ)

Cpk = min(Cpu, Cpl)

Cpk can never be larger than Cp. The two are equal only when the process is perfectly centered.

Worked example

A machined shaft has a diameter specification of 10.0 mm ± 1.0 mm, so LSL = 9.0 mm and USL = 11.0 mm. Data from a stable process gives a mean of 10.2 mm and a within-subgroup standard deviation of 0.25 mm.

Step 1: Cp

Specification width = 11.0 − 9.0 = 2.0 mm

Process spread = 6 × 0.25 = 1.5 mm

Cp = 2.0 / 1.5 = 1.33

Step 2: Cpu and Cpl

3σ = 3 × 0.25 = 0.75 mm

Cpu = (11.0 − 10.2) / 0.75 = 0.8 / 0.75 = 1.07

Cpl = (10.2 − 9.0) / 0.75 = 1.2 / 0.75 = 1.60

Step 3: Cpk

Cpk = min(1.07, 1.60) = 1.07

Check: what if the process were centered?

Move the mean to 10.0 mm and leave σ alone. Both sides become (1.0 / 0.75) = 1.33, so Cpk = 1.33, which equals Cp. That confirms the arithmetic: the gap between 1.33 and 1.07 is caused entirely by the 0.2 mm offset, not by excess variation.

IndexValueWhat it says
Cp1.33The spread would fit with room to spare if centered
Cpu1.07The upper limit is the tight side
Cpl1.60Plenty of room below
Cpk1.07Actual capability, limited by the offset

What to do with the result

The two indices point to different fixes. When Cp is acceptable but Cpk is low, the process has the precision it needs and is simply aimed wrong. Re-centering, for example through a tool offset or a setpoint change, is usually cheaper than reducing variation. When Cp itself is low, centering will not be enough, and the team needs to reduce variation at its source.

Many organizations use 1.33 as a minimum Cpk for existing processes, and some customers require higher values for critical characteristics. The right threshold is whatever your customer or quality agreement specifies.

Three cautions

  1. 01Check stability first. Capability indices assume a stable process. If a control chart shows special causes, the numbers describe nothing in particular.
  2. 02Check the distribution. The formulas above assume roughly normal data. Strongly skewed data needs a transformation or a non-normal capability method.
  3. 03Do not mix up Cpk and Ppk. Ppk uses the overall standard deviation of all the data, which includes shifts between subgroups. A large gap between Cpk and Ppk is itself a signal that the process drifts over time.

Put it into practice

Start with the free White Belt.

Learn the language of improvement and earn a certificate anyone can check at sigmaforge.ai/verify.